View all facilities

Cedar Niles Park

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
Documents

CNP-map

Cedar Niles Trail Alignment

Features

  1. Parking
  2. Trail Head

Cedar Niles Park is the newest park to open in JCPRD.

Currently, the Clare Road and the 119th Street parking lots are open for vehicles.

Approximately 2.1 miles of the paved trail is open. There is a barricade showing where the trail closure begins. In the future, sections of the trail will be closed intermittently for minor projects.

JCPRD's Cedar Niles property is located west of K-7, stretching from approximately 119th Street just past 135th Street. The property totals 957 acres and contains many natural assets including streams, dramatic topography and diverse plant life. The master plan for Cedar Niles was first developed in 2008. The predominate public opinion was that the park should include mostly passive uses, with a strong interest in a variety of trails.

The Cedar Niles Park design concept was presented at the Feb. 20, 2019 Regular Board Meeting.  The board moved to proceed with design and construction documents. 

VIEW: Cedar Niles Park Design Presentation

CNP-map
Click image to see larger version.

Areas of Development
 

127th and Clare Road (Currently Open)

  • Trail head
  • Paved parking lot
  • Water fountain (currently closed due to weather conditions)
119th Street West of K-7 (Currently Open)

  • Trail head
  • Paved parking lot
  • Water Fountain
    1. 135th St Trail-head Rendering

      135th Street Trail-head Rendering

COMING SOON:

135th Street Access Point

  • Trail head
  • Playground
  • Shelter
  • Restrooms
  • Water fountain

Future Implementation

  • Wetlands
  • Practice fields
  • Additional shelters
  • Restrooms
  • Off-leash dog area
  • Equestrian trails
  • Archery Range
  • Restored Prairie